Advanced Technology Design for hot UPW supply

Date Published: 2022 | Conference materials

Log in or Join UltraFacility to access this content

To access our resources you will need to be a member of UltraFacility, log in to your account or purchase a membership to view this content.

Already have an account? Log in

A study of operational decisions to increase capacity to allow greater consumption of hot ultrapure water. This presentation shows a new design in a fab which is successively transferred to the other existing hot ultra pure water plants, in order to be able to react to future changes in consumption.

Tags: UPW SystemUltraviolet (UV)Fab Operation

Related content

Conference material | 2018
Semiconductors: Driving Innovation and Changing the World
Conference material | 2021
Risk centered asset management
Conference material | 2015
THM – A Novel Sustainable Approach as a Global Solution for UPW Applications
Training series | 2018
End-of-Pipe Semiconductor Wastewater Reclaim

Back to Technical Knowledge Base

Not an UltraFacility Member?

Be part of year-round collaboration and knowledge exchange. Get access to the full range of tools leveraged by facility representatives and leading global experts from across the supply chain.

Book a demo

Find out how you can leverage UltraFacility Portal to achieve your business objectives today.

Request a demo